Order No. 07/2026-27 In the matter of determination of Aeronautical Tariff for Navi Mumbai International Airport, Navi Mumbai for the First Control Period (01.04.2025 - 31.03.2030).
This website belongs to Airports Economic Regulatory Authority of India (AERA). Website Designed, Developed by NetProphets Cyberworks Private Limited and Hosted by National Informatics Centre (NIC)